The grid connection
The timetable is set by the network, not by us
The operator applies for the connection and pays for it. We keep you informed on progress, but no one in the process can make the network move faster.
We assess the site, introduce the right charge point operator and stay close until the site is ready to build. You sign with the operator, not with us, and you pay nothing at any stage.

These figures describe how Volt Acre works. Timescales vary by site, and the grid connection is usually the longest stage.
The full journey
No two sites move at the same pace, and the middle of the process is slow because the grid sets the timetable. You can step away at any stage before signing.
Led by Volt Acre
Tell us where the site is and what it does today. An address and a rough idea of the parking is enough. We don't need plans, surveys or grid data at this stage.
Led by Volt Acre
Before anyone travels, we check the fundamentals from our desks: the local grid, access, traffic and what the surrounding area supports. Some sites fall out here, and it is better to learn that in days than after months of paperwork.
Led by Volt Acre
We walk the site: entrances, sightlines and where chargers could physically go. Then you get a plain answer of yes, no or not yet, with the reasoning. A no costs you nothing.
Volt Acre and the operator
A qualifying site goes to the operator best placed to build it. We prepare the site information and make the introduction, and from here you deal with the operator directly while we stay on hand.
Led by the operator
The operator runs its own surveys and applies for a grid connection. This is the slow part. Grid connections in the UK take months, not weeks, and we would rather say so now than have you hear it later.

The grid connection
The operator applies for the connection and pays for it. We keep you informed on progress, but no one in the process can make the network move faster.
The owner and the operator
You and the operator agree the commercial terms: rent or a revenue share, the length of the term and the number of bays. Lawyers then turn them into a lease or revenue agreement. The contract is between you and the operator, you should take your own advice on it, and until you sign you are free to walk away.
Led by the operator
With the agreement signed and the connection secured, the site is ready to build. The operator constructs the hub and switches it on, and your income begins. This is also the point at which Volt Acre is paid its referral fee, by the operator and never by you.

Construction
Groundworks, chargers, installation and upkeep are the operator's responsibility and cost. You provide the space and receive the income.
Who pays whom
The operator pays for the build. Chargers, groundworks, the grid connection, installation and maintenance are funded by the operator, who owns and runs the equipment.
The site owner is paid. Under the agreement signed with the operator, you receive rent or a share of charging revenue. You pay no fees, no capital and no running costs.
Volt Acre is paid by the operator, and only when a site reaches ready to build. If a site doesn't progress, nobody owes us anything, so the only sites we put forward are ones we believe will be built.

Questions
If yours isn't here, ask it. A short email is enough.
Nothing, at any stage. The assessment is free, the introduction is free, and the operator funds the entire build including the grid connection. Our fee comes from the operator, not from you.
It varies by site, and the grid connection is usually the longest stage: months, not weeks. What we can promise is a fast first answer and honest updates on timing throughout.
No. Nothing is binding until you sign an agreement with the operator, and that decision is yours, made with your own advisers. You can step away at any stage before that.
The operator. They own the equipment, keep it running, handle drivers and payments, and carry the operating risk. You provide the space and receive the income.
We tell you plainly, with the reason, which is usually power, access or traffic. Circumstances change, though. If the grid outlook or your plans improve, come back to us.