Skip to main content

The networks we introduce sites to

When we qualify a site, we bring its owner to the charge point operator best placed to fund, build and run it. This page is for operators who want site referrals, and for owners who want to know who they would be meeting.

Electric vehicles charging on a wet city street at night

The operators

Matched to the site, not to whoever answers first

Every operator funds, builds and operates its own equipment, including the grid connection. The owner's contract is with the operator; our role ends once the site is ready to build.

Matched case by case

Other operators

Whatever the site calls for

Every site is different. Where another operator is the better fit for your location, that's who we introduce.

What an introduction includes

A referral should save the operator work

Development teams have limited time for sites that turn out to have no power nearby or an owner who expected something different. We do that groundwork before we make contact.

By the time you meet the owner, the site has been assessed and the basics of the arrangement have been explained to them.

A formal conference room

With every referral

What arrives with the introduction

An assessed site

Power within reach, workable access, and traffic or dwell time that supports usage. We check these before an introduction, not after.

Prepared information

Location, bay counts, current use and known constraints arrive with the introduction, including the awkward details a first survey would otherwise find.

An owner who understands the proposition

The owner knows the operator funds and runs everything, that income comes as rent or a revenue share, and that timelines run to months.

One principal throughout

One of the two principals stays involved from first contact until the site reaches ready to build. You always know who to call.

Site referrals

Paid at ready to build, and not before

Tell us where you are growing and what a viable site looks like for you: power thresholds, bay counts, the locations you need. We will send referrals that fit that brief, and nothing that doesn't.

Paid by the operator

Our fee comes from the operator. The site owner never pays us, and is never asked to.

At ready to build

The fee falls due only when a site reaches ready to build: agreements signed, grid connection secured. A site that falls away costs you nothing.

No retainers

There are no retainers, upfront charges or fees along the way. That is why the sites we put forward are ones we expect to be built.

Referral enquiries

hello@volt-acre.com

Use the subject line “Site referrals”. You will be dealing with one of the two principals directly.

Email about referrals

Get in touch

Operator or owner, it starts the same way

Operators, tell us your brief. Owners, tell us about your site. Either way, you will get a considered answer rather than a pitch.

A busy UK motorway